SCOPE OF WORK

Replacement of the existing timber bridge on CR 63E (Pingree Park Road), 7 miles South of State Highway 14, improvements include:

  • demolition of the existing bridge
  • replacement with a new bridge over Little Beaver Creek
  • replacement of the adjacent cattle guard north of the bridge

PURPOSE

This project is planned due to:

  • deteriorating condition of the current bridge

BUDGET

Aerial view of a dirt road passing through a forested area with a small bridge over a creek. A vehicle is parked on the roadside near the bridge. Surrounding the road are dense trees and sparse brush.
Aerial View of Bridge

$   230,000 (design)

$1,400,000 (construction)

PROJECT STATUS

  • design is progress (JUB Engineering)
  • federal permitting in progress
  • construction is anticipated to begin in early 2027

CONTACT

Steven Rothwell Project Manager 
(970) 498-5715 