Larimer on the Move

An investment into the future of our vital transportation network to improve safety, efficiency & mobility options for all.
Interactive Mapping
Transportation Planning
- County Road 5
- Country Club Road Corridor Study
- Douglas Road Safety Improvement Project
- Freedom Parkway Access Control Plan
- Larimer on the Move
- Owl Canyon
If you would like a copy of any of the reports/plans/studies listed below, please please email your request.
** Please note that due to high work volume staff will respond to your request within two (2) business days. Staff appreciates your understanding and will get back to you as soon as possible. Please note that due to a high work volume, staff will respond to your inquiry within two (2) business days. We appreciate your understanding and will get back to you as soon as possible.
- 2019 Infrastructure Funding Strategies Report
- 2017 Transportation Master Plan
- 2017 Transportation Funding Study
- 2006 Transportation Master Plan (previous version)
- North Front Range Transit Vision Study
- Crossroads Blvd.
- I-25 Corridor
- LaPorte Area Plan
- US 287 Environmental Overview Study between Loveland and Fort Collins
- US 287 from SH 1 to LaPorte Bypass Environmental Assessment
- US 287 from SH 1 to LaPorte Bypass Impact Findings (FONSI)
- SH 402 Environmental Assessment
- US 34 Access Control Plan
- Colorado Highway 1 Access Control Plan
- High Plains Boulevard Access Control Plan )LCR 3, WCR 9.5, High Plains Boulevard)
Other Planning Agencies
- North Front Range Metropolitan Planning Organization (NFRMPO)
- Southwest Chief & Front Range Passenger Rail
- Front Range Passenger Rail
- Upper Front Range 2040 Regional Transportation Plan
- North Front Range Final 2040 Regional Transportation Plan
- 2040 Statewide Transportation Plan