- 2019 Infrastructure Funding Strategies Report
- 2017 Transportation Master Plan
- 2017 Senior Transportation Needs Assessment
- 2006 Transportation Master Plan (previous version)
- North Front Range Transit Vision Study
- Freedom Parkway Access Control Plan
- Owl Canyon
- County Road 5
- Crossroads Blvd.
- I-25 Corridor
- LaPorte Area Plan
- US 287 Environmental Overview Study between Loveland and Fort Collins
- US 287 from SH 1 to LaPorte Bypass Environmental Assessment
- SH 402 Environmental Assessment and Appendices
- High Plains Boulevard Access Control Plan (LCR 3, WCR 9.5, High Plains Boulevard)
Transportation Planning
Engineering Department - Transportation Planning
Attn Transportation Planning
200 West Oak Street, Suite 3000
P.O. Box 1190
Fort Collins, CO 80522-1190