Variances & Minor Modifications

Need Help? Contact the On Call Planner

Contacting the On Call Planner is easy and convenient with these 3 options: 

  • Send us an email at planning@larimer.org or directly via the online form.
  • Leave us a detailed voicemail at 970.498.7679
  • 15 minute in-person appointments are available for general planning questions. To make an appointment for our Fort Collins office, click here. 

Be sure to include the parcel number/address you are inquiring about. Please provide as much detail as possible so that we can thoroughly research and answer your questions. 

When unique site conditions prevent a project from meeting standard dimensional requirements in the Larimer County Land Use Code, such as building setbacks or height limits, property owners may apply for relief through one of two processes: a Minor Modification (an administrative review for small adjustments) or a formal Variance (reviewed by the Board of Adjustment for larger deviations)

Which Process Applies to Your Project?

Use the comparison below to determine whether your request qualifies as an administrative Minor Modification or requires a formal Variance. If your proposed setback reduction or dimensional adjustment exceeds the limits for a minor modification, you must apply for a formal Variance. 

 Minor Modification (administrative)Variance (public hearing)
Pre-application Meeting Required?NoNo
Scope of ReliefSmall, specific numerical/dimensional adjustments up to a strict maximum percentage or amount.Larger deviations where strict code compliance causes peculiar practical difficulties or undue hardship.
Decision MakerCommunity Development DirectorThe Board of Adjustment
Application Fee

$870.51 (subject to change; current fee at time of submission applies)

$1,646.52 (subject to change; current fee at time of submission applies)
Referral Period14-days minimum14-days minimum
Public Hearing Required?NoYes (held on the 4th Tuesday of each month)

To qualify for the administrative Minor Modification process, your request cannot exceed the maximum adjustments listed in Table 6-3 of the Land Use Code:

  • Front, Side, or Rear Setbacks (Minimum): Up to 10% reduction

  • Extension into Setback (Maximum): Up to 10%

  • Setbacks from Streams, Creeks, and Rivers: Up to 50% reduction (subject to additional environmental criteria in §6.7.1.D.2)

  • Setbacks from County Roads: Modifications for additions to existing nonconforming buildings (subject to minimum centerline distances in §6.7.1.D.3)

  • Lot Size (Minimum): Up to 10% reduction

  • Building Height (Maximum): Up to 20% increase

  • Fence or Wall Height (Maximum): Up to 2 feet

  • Parking Stalls Required (Minimum): Up to 20% reduction

  • Landscaping Requirements (Minimum): Up to 10% reduction

All applications require the following documents uploaded as separate PDFs:

  1. Project Description Narrative: A written explanation of your request, existing site conditions, and how your proposal meets the specific Land Use Code review criteria:

    • Minor Modifications: Address criteria in Article 6.7.1.D (demonstrating the request is technical in nature, compensates for an unusual site condition, meets safety codes, and avoids adverse impacts).

    • Variances: Address criteria in Article 6.7.3.D (demonstrating peculiar practical difficulty/undue hardship due to physical property conditions, or that the variance is nominal/equal to the standard, without harming neighboring properties).

  2. Scaled Site Drawing: Must include a north arrow, scale (e.g., $1''=40'$), property line dimensions, all existing and proposed structures, exact distances from structures to property lines/roads/easements, septic/well locations, and natural features.

    • For Setback Requests: Clearly label both the required setback and proposed setback, plus road intersection sight triangles if applicable.

    • For Height Requests: Include topographic contour lines and building elevation drawings.

  3. Site Photos: Photographs illustrating the physical conditions necessitating the variance or modification.

  4. Surveyor Certification or Waiver: It is strongly recommended to obtain a certified survey prior to applying; if inaccurate measurements are provided, the process must be repeated at full cost. If you choose not to submit a licensed survey upfront, you must submit a signed Waiver of Setback Certification Recommendation.

  5. Submittal Checklist: One copy of the checklist page, with all property owners signatures.

(Note: For Minor Modifications or Variances near waterways, Engineering staff may also require a Professional Engineer's hydraulic/hydrology analysis to ensure improvements sit outside the 100-year storm flow path.)

  • No Building Permits While Application is in Process: Building permits will not be accepted or issued on the property while a Variance or Minor Modification application is under review.

  • Post-Approval Setback Certification: If your setback variance or modification is approved, you will be required to submit a Setback Certification (signed and sealed by a Colorado Licensed Surveyor) as a condition of your subsequent building permit.

  • One-Year Expiration: Approvals will automatically expire one year from the approval date unless you take affirmative action (such as applying for a building permit).

  • Public Record: Once submitted, all application materials become a matter of public record.

  • Neighbor Notification: During the review process, neighbors may be sent a postcard to let them know about your project. You may also be required to post a sign on the property. When applicable, Larimer County staff will provide you with instructions for the posting of the sign, and provide you with the sign. For more details, see Article 6.3 of the Land Use Code. 


Contact Planning Division

200 W. Oak Street, Third Floor
Fort Collins, CO 80521

Mon:  8am - 4pm
Tue:   8am - 4pm
W:    10am - 4pm 
Thu:  8am -  4pm  
Fri:    8am -  4pm